← Knowledge

Adapt+ Funding for Green Spaces: Deadlines, Rates, Criteria

Adapt+ is the BAFU funding programme for climate-adapted green spaces (communication UV-2554, 29.01.2026). It funds indirect measures at 25%, planning at 30%, and implementation at 40% of eligible costs, with a 10% bonus for cross-sectoral risk reduction and an absolute maximum of 50%. The application window for the 2026 cycle ran from 29.01 to 31.03, and the funding decision is issued by 1 July at the latest.

Source
BAFU communication UV-2554, 29.01.2026
Funding rate, indirect measures
25%
Funding rate, planning
30%
Funding rate, implementation
40%
Cross-sectoral bonus
+10%
Absolute maximum
50%
2026 application window
29.01. – 31.03.
Preliminary review only if submitted by
27.02.
Funding decision at the latest
01.07.
CORE registration duration
up to 2 weeks
Official contact
adaptplus@bafu.admin.ch

Deadlines in detail

CORE registration (the portal through which applications are submitted) opens from 1 February. Applicants who submit by 27 February receive an informal preliminary review with feedback by 16 March — not after that date. The binding submission deadline ends on 31 March. The funding decision is issued by 1 July at the latest, and the project start is either 1 July at the earliest or 3 months after the decision at the latest. CORE registration itself can take up to two weeks — anyone starting shortly before 31 March risks missing the deadline.

The 80% rule

If the effect promised in the application is actually achieved to less than 80%, chapter 8.6 of the communication provides for a proportional clawback. The burden of proof for this lies with the applicant — careful, traceable documentation of implementation is therefore not a formality but genuine financial protection.

Choice of tree species

Chapter 5.3.1 requires that tree species be specifically named in an application. Priority is given to species with a Biodiversity Index above 2 in settlement areas, or at least 3 outside them (see our article on the Biodiversity Index). Invasive species are excluded, and allergenic potential must be considered.

For your business

An application with specifically named, index-backed tree species and traceable impact documentation visibly reduces the 80% clawback risk — that is a concrete argument you can offer your municipal clients.

For the commissioning authority

The chain of deadlines (preliminary review 27.02, submission 31.03) is tight — a municipality should start preparation well ahead of the window, not only in January.

What this does not mean

  • This summary does not replace studying the full BAFU communication UV-2554 — in particular, the 7 formal and 11 substantive criteria are not reproduced in full here.
  • There is no green-space-specific official Adapt+ template or checklist — neither from BAFU nor from the cantons, Grünstadt Schweiz, VSSG, or JardinSuisse. Anyone looking for an "official template" will not find one.
  • There is no public BAFU list of already-approved Adapt+ projects to use as a reference.
  • Deadlines and percentages apply to the 2026 cycle — future cycles may differ; the authoritative source is always the current BAFU communication.

Frequently asked questions

By when must an Adapt+ application be submitted in 2026?
The binding deadline for the 2026 cycle ended on 31 March. An informal preliminary review was only possible if submitted by 27 February.
What happens if the promised effect is not achieved?
If less than 80% of the effect stated in the application is achieved, the communication provides for a proportional clawback (chapter 8.6). The burden of proof lies with the applicant.
Is there an official template for an Adapt+ application for green spaces?
No, no such green-space-specific template exists publicly at any of the bodies checked (BAFU, cantons, Grünstadt Schweiz, VSSG, JardinSuisse).

Sources